Interim SEEP Remediation Operation and Maintenance Report #14
This Operations and Maintenance Report #14 (O&M Report #14) has been prepared to document the operations, maintenance, and performance of the flow-through cells at Seeps A, B, C, and D from March 1 through April 30, 2023.
CFR Long-Term Remedy Performance Monitoring Report #7 (Q3 2024) July - September 2024
This CFR Long-Term Remedy Performance Monitoring Report #7 (“Report”) has been prepared for the Q3 2024 period of July 1 through September 30, 2024, and documents the operation of the interim seep Flow-Through Cells (FTCs), the ex-situ seeps and weeps capture systems (“Ex-Situ Capture Systems”), the groundwater extraction and conveyance system (GWEC), and the groundwater treatment plant (GWTP).
CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER Quarterly Report #2
This report was prepared by Geosyntec Consultants of NC, P.C. (Geosyntec) for The Chemours Company FC, LLC (Chemours) to provide a quarterly update on the identification and concentrations of per- and polyfluoroalkyl substances (“PFAS”) in process wastewater, non-process wastewater, and stormwater at the Chemours Fayetteville Works, North Carolina site