搜索结果

以下是您查询的搜索引擎结果。

显示中 1511-15202743 结果

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #6

Please find enclosed the Interim Seep Remediation Operation and Maintenance Report #6.

INTERIM SEEP REMEDIATION OPERATION AND MAINTENANCE REPORT #1 COVER LETTER

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Interim Seep Remediation Operation and Maintenance (O&M) Report #1 (“O&M Report”) on behalf of The Chemours Company FC, LLC (Chemours) to provide a bi-monthly (every two months) summary report of Operations and Maintenance for the flow-through cell (FTC) installed as the interim remediation system at Seep C at the Chemours Fayetteville Works Site (the Site).

Interim Seep Remediation Operation and Maintenance Report #11

Interim Seep Remediation Operation and Maintenance Report #11

CHARACTERIZATION OF PFAS IN PROCESS AND NON-PROCESS WASTEWATER AND STORMWATER

Paragraph 11(d) Ongoing Sampling Final Report: 2021 – 2022 Bimonthly Sampling

STORMWATER TREATMENT SYSTEM SAMPLING PLAN

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Stormwater Treatment System Sampling Plan (“Sampling Plan”) on behalf of The Chemours Company FC, LLC (Chemours) pursuant to the requirements of Paragraph 4(b) of the Addendum to Consent Order Paragraph 12 (CO Addendum)

Determination of Table 3 Compounds by LC/MS/MS Chemours Fluoroproducts

SOP No. WS-LC-0031, Rev. 2.6

Table 3 SOP Revisions (WS-LC-0031)

Memorandum

THERMAL OXIDIZER CONTROL EFFICIENCY COMPLIANCE TEST REPORT TEST DATES: 4-5 FEBRUARY 2020

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA

FLUOROMONOMERS MANUFACTURING PROCESS VINYL ETHERS NORTH CARBON BED REMOVAL EFFICIENCY AND DIVISION STACK EMISSIONS TEST REPORT TEST DATES: 24 AND 25 SEPTEMBER 2019

THE CHEMOURS COMPANY FAYETTEVILLE, NORTH CAROLINA

INTERIM SEEP REMEDIATION SYSTEM PLAN

Geosyntec Consultants of NC, PC (Geosyntec) has prepared this Interim Seep Remediation System Plan (“Interim Plan”) on behalf of The Chemours Company FC, LLC (Chemours) to provide a design basis for the flow-through cells that are to be installed as the interim seep remediation system at four groundwater seeps at the Chemours Fayetteville Works Site (Figure 1; the Site).